Meeting of May 12, 2026

Wildfire rules, deed-restricted housing and Riverwalk access

Council will consider townwide wildfire rules, several property decisions and a summer camp contract, while postponing the next 555 Basalt Avenue hearing.

SAFETY & PROPERTYBack again

Wildfire construction rules return for a final vote

Council will take its final vote on Colorado’s 2025 wildfire-resiliency code. The rules would apply to new construction and certain larger additions, replacements or remodels in mapped wildfire-risk areas.

What changed since last time

Council approved the ordinance 5-0 on first reading April 28; May 12 is the second reading and final adoption vote. The first-reading motion added a right to appeal the building official’s modification decisions to Town Council. Staff may return later if the state approves Basalt’s requested broader amendments.

What it means for you

For residents, the code could improve wildfire safety across Basalt while adding design, material and permitting requirements to some construction projects.

The full picture

Council is being asked to approve Ordinance No. 07, Series of 2026, on second reading. A second reading is the final council vote needed to adopt an ordinance after its initial approval. The ordinance would amend Section 18-103 of the town code and adopt the 2025 Colorado Wildfire Resiliency Code by reference, meaning the state document would become part of Basalt’s enforceable building rules without being copied word-for-word into the town ordinance. Staff recommends approval. The May 12 agenda schedules another public hearing before the vote.

This is the ordinance’s second appearance before council. On April 28, Town Attorney Jeff Conklin and Chief Building Official Mitch Miller explained that the Colorado Legislature created a state wildfire-resiliency board and directed it to prepare a model code. Local governments in the wildland-urban interface—the places where buildings and developed areas meet or mix with vegetation capable of carrying wildfire—must adopt standards that at least meet the state code. Miller said Basalt had already been working on many of these issues and was ahead of the state process in some respects.

Council approved the ordinance on first reading April 28 by a 5-0 vote. First reading is an initial vote that advances an ordinance but does not make it final. Council added language allowing a property owner to appeal a building official’s decision about a requested modification to the Town Council. That appeal provision is the clearest change made during the first vote. The prior packet also identified July 1, 2026, as the deadline for Basalt to begin enforcing a qualifying wildfire code, making the May 12 vote part of a relatively tight implementation schedule.

The code has two broad parts: requirements for making structures more resistant to wildfire and requirements for the site or area around a structure. The packet says the applicable standards depend on a property’s wildfire intensity designation. New construction would be covered, while a specified amount of replacement, remodeling or an addition could also trigger compliance. The excerpt does not provide the exact thresholds, material specifications or wildfire map, so it does not show which roof, siding, vent, window, deck, fence or landscaping products would be required at a particular address.

The building official would have some authority to approve alternative materials or site-specific modifications when those choices would not increase wildfire danger or reduce safety. Staff also proposed local language giving the building official discretion when determining whether a fire hazard or unsafe structure exists. A property owner dissatisfied with a modification decision could use the appeal to council added April 28. Broader local departures from the state code must go through a variance process with the state; staff said it would return with another town amendment if Colorado approves the larger changes Basalt has requested.

The ordinance could affect property owners, builders, architects and contractors throughout Basalt’s mapped wildfire-risk areas. The supplied pages do not identify whether Old Town, Willits, Southside, Midland Avenue or other named neighborhoods are wholly or partly covered. For Basalt as a whole, the public benefit is greater resistance to wind-driven embers, flames and radiant heat, potentially reducing the chance that one burning structure spreads fire to nearby buildings. The trade-off is that qualifying projects may require different materials, more design work, additional review or changes around a building.

No dollar amount is attached to the ordinance. The packet does not estimate the added cost for a typical house, commercial building, remodel or addition, and it does not identify rebates, grants or insurance savings that could offset compliance expenses. It also does not say whether the town needs more inspectors, training or permit revenue. Council must weigh those unanswered affordability questions against the state mandate, Basalt’s wildfire exposure and the long-term safety value of building structures that are less likely to ignite.

If approved May 12, the ordinance would become Basalt’s final adopted wildfire code, subject to the ordinance’s stated effective date and the state implementation requirements. Staff could later return if Colorado approves Basalt’s requested variances or if further local clarification is needed. Residents may speak for three minutes during public comment near the start of the 6 p.m. meeting and again during the ordinance’s public hearing. Written comments may also be emailed to council before the meeting so they are included in the public record.

Email council about this item
SOUTHSIDE DEVELOPMENTBack again

The 555 Basalt Avenue hearing is postponed again

Council is scheduled to move the 555 Basalt Avenue hearing to May 26 without discussing the project May 12. The proposal remains 47 homes and 54 commercial storage or flexible-work units.

What changed since last time

Council continued the hearing from April 28 to May 12 after discussing housing, traffic and Southside access. The May 12 consent agenda now proposes another continuance, to May 26, with no substantive hearing or decision this week. The agenda does not identify a changed unit count, housing offer or circulation plan.

What it means for you

For Southside residents, the housing, traffic, Cody Lane and Fiou Lane questions remain unresolved until at least May 26.

The full picture

Council is not being asked to approve or deny the 555 Basalt Avenue redevelopment on May 12. Instead, the consent agenda proposes continuing the public hearing to May 26. A continuance moves an open hearing to a later date without deciding the application. Because the continuance is on the consent agenda, it can be approved with other routine items in a single vote unless a council member asks to remove it for separate discussion. The agenda gives no reason for the additional delay and identifies no new plan revisions for May 12.

The application concerns the Myers & Company property in Southside, next to Fiou Lane and Cody Lane. MREH LLC, represented at the previous meeting by Mareike Blodgett and Justin Fries, proposes demolishing the existing improvements and developing 47 residential units and 54 commercial storage or flexible-work units. The property is approximately 4.8 acres, is zoned Industrial and lies within the Basalt Business Center South planned unit development. A planned unit development is a customized zoning plan that sets rules for a particular property or group of properties.

Council held a site visit and a lengthy public hearing April 28. The application requires special review, site-plan approval, amendments to the existing planned unit development and actions involving the Southside floodplain. Staff also determined that the project needs changes to Basalt’s master plan future-land-use map and typology descriptions. The current master plan labels the property as an existing industrial use rather than land expected to redevelop during the plan’s life, and its mixed-use guidance anticipates residential and commercial uses being integrated rather than separated into different portions of the property.

The latest housing offer discussed April 28 would restrict 22 of the 47 homes, or 47% of the project. Eleven would be for-sale, price-capped homes averaging Category 3 under Basalt’s housing system. Another 11 would carry primary-residency restrictions but would not have the same price and income limits. Council members questioned whether 47% was enough, particularly for land near regional transit. They compared the proposal with projects that reached 50% or 60% restricted housing and asked what public benefit would justify changing the master plan for one development.

Traffic and emergency access remain major open questions. The applicant revised its analysis so that 24 commercial units totaling 24,000 square feet would be treated as light industrial space, while 30 units would be legally limited to storage. The traffic consultant estimated 27 trips in the morning peak hour and 39 in the afternoon, compared with counts of 31 morning and 40 afternoon trips from the existing Myers operation. Residential vehicles would use Cody Lane, while commercial traffic would use Fiou Lane. Those estimates depend on the proposed use restrictions being enforceable over time.

Six circulation alternatives were reviewed April 28. The applicant, a preschool operator and much of the discussion favored Alternative 4, which would make Summerset Lane one-way northbound and Fiou Lane one-way southbound while adding pedestrian circulation and firefighting access. The fire department reportedly would not accept the two least extensive alternatives. A representative of the Basalt Business Center East homeowners association raised concerns about sending more traffic to Cody Lane, which he described as narrow, without sidewalks and bordered by ditches. Council also heard that the town currently lacks money for Fiou Lane improvements.

Council members did not reach agreement on the broader planning trade-offs. Several expressed concern about changing the master plan to fit an individual proposal, the amount of market-rate housing, the project’s density, the absence of meaningful green space and Southside’s limited emergency exits. The applicant asked what housing percentage or other community benefit would gain council support. Staff was expected to draft an ordinance containing possible conditions, but the May 12 agenda does not include that ordinance or explain whether the applicant is revising the plan before May 26.

The packet does not provide updated project costs, unit prices, rents, road-improvement budgets or a construction schedule. It also does not resolve who would pay for Fiou Lane, Cody Lane, sidewalks or other circulation work. After the land-use decision, a separate council subdivision review would still be needed to create individually owned condominium units. Residents may speak for three minutes during general public comment at the start of the May 12 meeting. Because the item is on consent for postponement, anyone seeking discussion May 12 may ask council to remove it; residents may also testify when the hearing resumes May 26 and email council beforehand for the record.

Email council about this item
ENERGY FEESNew

Council will decide whether an energy-mitigation fee applies to a Running Brook spa

Council will decide whether to uphold staff’s interpretation that Basalt’s Residential Energy Mitigation Program applies to a spa at 475 Running Brook Drive. The packet excerpt does not state the fee amount.

What it means for you

For property owners, the decision could clarify when energy-mitigation fees apply to high-energy residential amenities across Basalt.

The full picture

Council is being asked to adopt Resolution No. 23, Series of 2026, ratifying an interpretation by the town planner and building official concerning a spa at 475 Running Brook Drive. To “ratify” means council would formally confirm and approve the staff interpretation. The interpretation addresses whether Basalt’s Residential Energy Mitigation Program fee applies to the spa. The agenda recommends adoption, but the supplied pages do not include the resolution, staff memorandum, property-owner arguments, calculations or underlying interpretation.

The Residential Energy Mitigation Program is identified only by its title and acronym in the agenda. In plain language, it is a town energy rule that may require mitigation or a payment when a residential project includes certain energy-consuming features. The excerpt does not reproduce the applicable town-code section, define “spa,” describe the equipment or explain the precise trigger staff applied. It also does not say whether this is a new spa, a replacement, part of a larger building permit or an amenity installed without a final fee determination.

Council’s task appears narrower than rewriting the energy program. Resolution No. 23 would decide whether to stand behind the planner and building official’s reading of the existing rule for this property. Because resolutions generally take effect through a single vote, there is no first and second reading as there is for an ordinance. The agenda does not label this item as an ordinance amendment and does not propose changing the code’s wording. Any broader precedent would therefore arise from how the existing rule is interpreted, not from new legislative language included in the supplied packet.

The most important missing fact is the amount of money at stake. The agenda does not identify the calculated fee, the formula used, the spa’s size or energy demand, or whether an alternative on-site mitigation measure is available. It also does not say whether the owner has already paid anything, whether a permit is being withheld, or whether interest or penalties could accrue. Residents cannot determine from the excerpt whether this is a modest permit charge or a substantial project expense.

The immediate effect falls on the property at 475 Running Brook Drive, but the reasoning may matter to other Basalt homeowners planning spas or similarly energy-intensive residential features. The agenda does not identify the property’s subdivision or connect Running Brook Drive to Old Town, Willits, Southside, Midland Avenue or El Jebel. For Basalt as a whole, the issue is consistency: comparable projects should generally be treated alike, while property owners should be able to understand the rules and estimate costs before committing to construction.

Council may reasonably ask when the Residential Energy Mitigation Program was adopted, what language creates the fee, how staff has treated similar spas and whether the interpretation has been consistently applied. Other useful questions include whether the feature is inside or outside, permanently installed or portable, heated by electricity or another fuel, and whether its energy use was calculated using a town-approved method. None of those facts appears in the supplied agenda excerpt, so they should not be assumed. The absence of the underlying documents also makes it unclear whether the owner agrees with staff or is challenging the determination.

The trade-off is between enforcing Basalt’s energy rules as written and avoiding an interpretation that reaches farther than residents could reasonably anticipate. Upholding staff could support energy-conservation goals and consistent fee collection. Rejecting or modifying the interpretation could reduce this property owner’s cost but might require council to explain how future applications should be handled. The agenda does not list alternative motions, such as remanding the matter to staff, requesting more evidence or directing a future code amendment.

If Resolution No. 23 passes, the planner and building official’s interpretation would receive formal council approval, after which the property’s permit and fee process could proceed under that interpretation. The packet does not give a payment deadline, construction schedule or appeal path after council acts. Residents may speak for three minutes during general public comment near the start of the meeting and again when Resolution No. 23 is called. Written comments may be emailed to council before the meeting so questions about the fee, consistency or precedent become part of the record.

Email council about this item
HOUSINGNew

A second deed-restricted home is proposed at 540 Basalt Avenue

A 659-square-foot, two-bedroom Category 5 home would be added above an existing mixed-use property near Fiou Lane. The application would not expand the building footprint.

What it means for you

For Southside residents, the proposal adds one price-restricted home near Basalt Avenue and Fiou Lane without enlarging the existing building footprint.

The full picture

Council is being asked to approve Ordinance No. 08, Series of 2026, on first reading for a new deed-restricted dwelling at 540 Basalt Avenue. The agenda page calls the address “540 Park Avenue,” while the staff report, vicinity description and ordinance item heading identify 540 Basalt Avenue. That discrepancy should be clarified during the hearing. Staff recommends initial approval and scheduling a second reading for May 26. First reading is the preliminary vote; second reading is the final adoption vote after another public hearing.

PC Development, LLC has applied for site-plan review, special review, a planned unit development amendment and approval of a housing mitigation report. Site-plan review examines the physical arrangement of a project. Special review is the town’s case-by-case consideration of a use that is allowed only after closer examination. A planned unit development amendment changes the customized zoning rules for this property. The housing report addresses how the proposal fits Basalt’s affordable-housing requirements and restrictions.

The property contains 7,838 square feet and sits at the northwest corner of Basalt Avenue and Fiou Lane in Southside. It is within the Industrial zone district and the Basalt Business Center South planned unit development. Mixed-use properties border it to the north and west, and the surrounding area contains commercial, residential and industrial uses. The Southside floodplain crosses the site, but the application proposes no change to the building envelope or footprint, which limits the physical expansion under review.

The building is already mixed-use. The Rug Wash operates on the ground floor, and a 758-square-foot, two-bedroom residential unit occupies the second floor. The applicant proposes adding another two-bedroom home measuring 659 square feet. The new unit would be deed-restricted at Category 5 under Basalt’s community-housing system. A deed restriction is a recorded legal limit that remains attached to the property and controls matters such as eligible occupancy and, depending on the town’s category rules, price or rent.

The supplied report does not state whether the new unit would be rented or sold, its expected price or rent, its exact floor-plan location, parking assignment or number of occupants. It also does not provide architectural drawings in the excerpt, describe exterior alterations or identify construction materials. Because the footprint and building envelope would not change, the proposal appears focused on converting or building out space within the existing development limits, but the packet excerpt does not say which existing area would be altered.

Both the Basalt Affordable Community Housing Commission and the Planning and Zoning Commission recommended approval with conditions included in the draft ordinance. The Planning and Zoning Commission considered the item March 17, 2026. The supplied pages do not reproduce the conditions, so residents cannot see whether they address parking, floodplain compliance, access, utility capacity, occupancy monitoring, building permits or the continued operation of the ground-floor business. Council should clarify those conditions before its first vote.

Staff connects the proposal to master-plan goals supporting housing for a range of incomes, diverse housing types near commercial and transit centers, walkability, workforce housing and live-work arrangements. For the immediate Southside area, one additional household could modestly affect parking and daily activity at Basalt Avenue and Fiou Lane. For Basalt as a whole, the project adds one deed-restricted home without consuming a new parcel or expanding the building footprint. Its small scale limits the overall housing impact but also limits construction-related neighborhood change.

No project cost, public subsidy, town expenditure or completion date is provided. The packet does not say whether the Category 5 restriction satisfies an existing housing obligation or is being offered as the project’s primary public benefit. If first reading passes May 12, the ordinance would return May 26 for its second reading and final decision; building permits and compliance with any approval conditions would follow. Residents may speak for three minutes during general public comment at the start of the meeting and again during the item’s public hearing. Comments may also be emailed to council before the meeting for inclusion in the record.

Email council about this item
MIDLAND AVENUE ACCESSNew

A vehicle gate is proposed at the Fryingpan Riverwalk development

Council will consider allowing a vehicle gate at the Riverwalk at Fryingpan development, 227 Midland Avenue. The supplied packet does not explain who could use the gate or how access would change.

What it means for you

For Old Town and Midland Avenue residents, the gate could change vehicle access at 227 Midland Avenue, though its operating details are not provided.

The full picture

Council is being asked to approve Ordinance No. 09, Series of 2026, on first reading for a vehicle gate at the Riverwalk at Fryingpan development, 227 Midland Avenue. The approval would amend the property’s planned unit development, the customized zoning plan governing the site. Staff’s suggested motion would advance the ordinance and schedule the public hearing and second reading for May 26. First reading is an initial vote; second reading is the final council decision.

The May 12 agenda identifies Interim Planning Director James Lindt as the presenter but the supplied packet excerpt does not include the staff report, draft ordinance, application, site plan or applicant’s explanation. As a result, the only confirmed physical proposal is a vehicle gate at the named development. The packet does not show where on the property the gate would sit, which driveway or lane it would control, whether it already exists, or whether other barriers, signs, keypads or turnaround areas are proposed.

The phrase “Riverwalk at the Fryingpan Development” may refer to the project’s formal planned unit development name, but the excerpt does not define whether the affected route is private, publicly accessible or connected to a pedestrian riverwalk. It would be inaccurate to assume the gate closes a public street or public trail. The ordinance title specifically calls it a vehicle gate, which suggests pedestrian access may be treated separately, but the supplied material does not confirm whether people walking, bicycling or using mobility devices would be able to pass.

Important operating details are also absent. The packet does not state whether the gate would remain closed continuously, operate only during certain hours or open automatically. It does not identify who would receive access—residents, employees, customers, delivery drivers, emergency responders or service vehicles—or what technology would be used. There is no information about emergency overrides, power failures, snow removal, queuing space, vehicle stacking or the time required for the gate to open.

The location at 227 Midland Avenue places the proposal in the Midland Avenue and Old Town area, where changes to vehicle circulation can matter beyond a single property. Depending on its position and operation, a gate could improve private-site security or control unwanted vehicle entry. It could also cause drivers to stop, wait, turn around or seek another route. Those possible effects are reasonable questions for council, but the packet does not provide traffic counts, neighboring-property comments or a circulation analysis establishing whether any of them are expected.

No project cost, town contribution, maintenance responsibility or construction date is stated. The agenda does not say whether the applicant would pay all installation and operating expenses, although the proposal is tied to a private development application. It also does not say who would repair the gate, remove snow around it or respond if it malfunctioned. The draft ordinance may contain conditions on those matters, but those conditions are not present in the supplied excerpt and should not be assumed.

Council’s trade-off is between allowing the development to manage vehicle access and preserving safe, understandable circulation around Midland Avenue. Reasonable questions include whether emergency services have approved the design, whether a stopped vehicle can wait without blocking a sidewalk or travel lane, whether deliveries can enter, and whether pedestrian and bicycle access remains open. Council could approve the ordinance, amend it with conditions, seek more information or decline to advance it. The agenda does not identify the staff recommendation beyond providing a suggested approval motion.

If first reading passes, the application returns May 26 for a second public hearing and final vote. Approval on May 12 alone would not be the final authorization under the ordinance process. Residents may speak for three minutes during the general public-comment period near the start of the meeting and again when the gate application is called. Written comments may be emailed to council before the meeting so concerns about emergency access, pedestrian movement, traffic or operating hours are included in the public record.

Email council about this item
YOUTH PROGRAMSNew

Basalt plans to renew its summer youth day-camp operator

Basalt would renew its youth day-camp coordinator, who would receive 85% of registration fees. Families would continue registering and paying through the town website.

What it means for you

For Basalt families, summer camps would continue through the town, with program details and fees subject to the recreation director’s approval.

The full picture

Council is being asked to approve Resolution No. 22, Series of 2026, authorizing a professional-services agreement for Basalt Recreation’s summer youth day camps. The item is on the consent agenda, meaning it is scheduled for approval with other routine business unless a council member removes it for discussion. The resolution authorizes the town manager or recreation director to sign the agreement and direct the contractor’s work. It also approves actions the town has already taken in procuring or preparing the services.

The contractor has operated Basalt’s youth camps for several years. The resolution refers to the “Phaffmann Group, LLC,” while the agreement identifies “Garry Pfaffmann doing business as the Pfaffmann Group Inc.” The agenda title spells the business “Pfaffmann Group, LLC.” Those differences in spelling and business form should be corrected or clarified before signing so the town’s contract is with the intended legal party. The agreement lists a contractor address of 70 Easy Street in Carbondale.

Under the proposed arrangement, the contractor would serve as youth camp coordinator and would manage, oversee and operate the day camps as an independent contractor rather than a town employee. Registration and payment would go through the Town of Basalt website. The contractor would determine fees, programming and other camp elements, but those decisions would require approval from the recreation director. The packet does not provide the 2026 camp calendar, age ranges, daily schedule, enrollment limit, registration opening date or the actual fees families would pay.

The contractor would receive 85% of all camp registration fees collected by the town. The agreement does not set a fixed dollar payment or guaranteed minimum. It also does not explain how the remaining 15% would be used. The resolution says sufficient money is available in the 2026 town budget, but it does not identify a budget line or estimated total. Because compensation depends on registration revenue, the final payment will vary with enrollment and the approved camp prices.

The camps may use Arbaney Park with the recreation director’s approval. The contractor would be responsible for obtaining participant liability waivers using a form prepared by the town. The contractor may hire subcontractors but must pay them directly and remains responsible for liability connected to their work. Background checks are required for all contractor employees and subcontractors working on the camps. The packet does not describe staff-to-child ratios, training requirements, transportation, swimming or field-trip procedures, food service, cancellation policies or accommodations for children with disabilities.

Insurance requirements include at least $1 million per occurrence in general liability coverage and at least $1 million in combined single-limit automobile liability coverage when applicable. The town must be named as an additional insured. Workers’ compensation and other legally required coverage must also be maintained, and insurance requirements must be included in subcontracts. These provisions are intended to protect both participants and the town, though the packet does not identify whether the contractor has filed the required insurance certificates yet.

The agreement would last until the services are completed or 364 days after its effective date, whichever comes first, unless extended in writing. The town could end it without cause with 30 days’ notice, while the contractor could do so with 60 days’ notice. The town could terminate more quickly for an uncured contract violation. The agreement is also subject to annual appropriation, meaning the town cannot be obligated in a future budget year unless council provides funding.

For Basalt families, the contract preserves a familiar channel for youth recreation and summer child supervision, but the packet leaves the practical details and household cost unanswered. Council may want confirmation of dates, prices, capacity, refund rules and what happens if the contractor withdraws during the summer. Residents may speak for three minutes during public comment at the start of the meeting and ask council to remove the item from consent for discussion when it is called. Families may also email council before the meeting so comments about affordability, safety or programming become part of the record.

Email council about this item

Get the next brief in your inbox

Agendas post the Friday before each Tuesday meeting. We read them over the weekend so you have days to write in or show up.

What should we send you?