Meeting of March 10, 2026

Wildfire rules, speed cameras and a Willits arts lease

Council will discuss town-wide wildfire construction rules, continue work on automated speed enforcement, review emergency access and consider a lease and renovation funding for arts space in Willits.

PROPERTY & SAFETYNew

Wildfire rules could apply to every Basalt property

Council will discuss proposed wildfire construction and landscaping standards that could apply town-wide. New buildings and some major renovations could require fire-resistant materials and defensible space.

What it means for you

If I build or substantially renovate in Basalt, I could face new requirements for roofs, siding, windows, decks, fencing and landscaping.

The full picture

Council will hold a 5 p.m. work session on adopting the Colorado Wildfire Resiliency Code, a state-created set of minimum construction and property-maintenance standards intended to reduce wildfire damage. This is a discussion rather than a scheduled ordinance vote. Staff and the town attorney are asking for direction on how broadly the code should apply, what local changes Basalt should make and who should decide requests for exceptions. Any binding adoption would have to return through a future ordinance process that is not scheduled in the supplied agenda.

Colorado Senate Bill 23-166 created the State Wildfire Resiliency Code Board, which developed the code. It took effect July 1, 2025. Senate Bill 25-142 requires local governments to adopt rules meeting or exceeding the state standards. Basalt staff has been working with the Roaring Fork Fire Rescue Authority and neighboring governments on implementation. Basalt already regulates wildfire hazards through its zoning, subdivision and building rules, but the new code would largely replace those provisions. The packet also notes that communities around Colorado are struggling with implementation and that the Colorado Municipal League may seek a delay in state compliance deadlines.

The state map places parts of Basalt in low- and moderate-intensity categories, while other areas are unmapped. Staff’s most consequential local proposal is to treat every property inside town limits as part of the wildland-urban interface—the area where development meets or mixes with vegetation—and to require the stronger Class 2 construction standard regardless of the mapped classification. Class 2 includes Class 1 protections such as Class A roofing, noncombustible gutters and ember-resistant vents, then adds protections for eaves, walls, underfloor spaces, decks, windows, exterior doors and garage-door gaps.

Under the draft, acceptable exterior construction could include noncombustible materials, fire-retardant-treated wood, ignition-resistant products, heavy timber, log walls or certain one-hour fire-rated wall assemblies. Eaves and soffits would need protected undersides. Exterior glass generally would need to be tempered, multilayered, glass block or rated for at least 20 minutes of fire exposure. Exterior doors generally would need noncombustible construction, solid wood at least 1¾ inches thick or a 20-minute fire rating. Unenclosed decks would have to use listed fire-resistant materials, and garage-door perimeter gaps generally could not exceed one-eighth inch.

Landscaping rules are organized in rings around a structure. From zero to five feet, the draft generally calls for hard, noncombustible surfaces such as rock, gravel, concrete, bare earth or pavers, with only approved ignition-resistant plants. No new trees would be allowed there, although qualifying mature trees could remain if pruned and separated from the building. From five to 30 feet, owners would remove dead plant material, avoid large fuel accumulations, prune lower branches and separate tree crowns and shrubs. From 30 to 100 feet, tree crowns generally would need six to 10 feet of spacing. Fences and retaining walls close to structures also could require noncombustible or ignition-resistant materials.

The code would primarily be triggered by new development, new or replacement landscaping and substantial exterior work. The attorney’s memo says ordinary structure-hardening work or other building alterations would not by themselves trigger all landscaping rules, except that replacement of more than 25% of exterior walls would bring the immediate zero-to-five-foot area into compliance. Additions under 500 square feet, limited roof or wall repairs, painting and some small detached structures have exceptions. Existing legal uses generally could continue, but the building official could intervene where a condition presents a distinct danger or where work would make a structure unsafe.

The draft gives the Basalt Building Department authority to review plans, issue permits, inspect work, approve equivalent materials and issue stop-work orders. A property owner seeking a site-specific review of the state wildfire map could submit technical documentation from a qualified wildfire professional addressing vegetation within 300 feet of the parcel, topography, weather and fire behavior. Technical opinions, testing and professional reports requested for an application would be paid for by the owner or applicant. The packet does not provide a proposed permit-fee schedule, town staffing cost, compliance date or estimate of how the rules could change construction and landscaping costs.

A major policy choice is who decides when literal compliance is impractical. The state code allows the building official to approve a modification for an individual property if it remains consistent with the code’s purpose and does not reduce health, life or fire safety. Staff has also discussed making Town Council the decision-maker. That could provide public oversight but make individual decisions slower and more political. Other trade-offs include applying stronger rules to low-risk and unmapped properties, removing vegetation near buildings, preserving mature trees and historic character, and reconciling wildfire safety with the cost and availability of approved materials.

Residents may speak for up to three minutes during the general public-comment period near the start of the regular meeting and may comment again when the wildfire item is called, subject to the mayor’s meeting procedures. Because the discussion begins during the 5 p.m. work session, residents should confirm how public comment will be handled for that session. Written comments can also be emailed to council for inclusion in the public record, particularly on town-wide coverage, renovation triggers, tree rules and who should decide modification requests.

Email council about this item
STREETS & SAFETYBack again

Speed-camera ordinance returns with a vendor agreement

Council will continue its first vote on automated traffic enforcement and separately consider an agreement with Dacra Tech. A final ordinance hearing is proposed for March 24.

What changed since last time

The ordinance is still at first reading, but the March 10 agenda calls it a continued first reading and now proposes a March 24 final hearing. Council will also consider Resolution No. 11, a separate agreement with Dacra Tech LLC, bringing the prospective vendor relationship before council alongside the legal authorization.

What it means for you

If I drive through Basalt, cameras could eventually document speeding or other violations, though locations, costs and operating details remain unsettled.

The full picture

Council will take up two connected decisions. First, it will continue the first reading of Ordinance No. 05, Series of 2026, which would authorize automated vehicle identification systems and add related penalties to Basalt’s code. A first reading is preliminary approval, not final adoption. Staff recommends advancing the ordinance and setting a public hearing and second reading—the ordinarily final council vote—for March 24. Council will then consider Resolution No. 11, approving an agreement with Dacra Tech LLC. The packet excerpt does not reproduce that agreement’s price, duration, equipment count or termination terms.

This topic began with a February 10 presentation by Basalt Police Lieutenant Aaron Munch and DacraTech representative Brandon Knox. Council discussed camera placement, dirty or snow-covered plates, signs, warnings, data retention, appeals, repeat violations, revenue, collections, equipment costs and whether police could receive real-time alerts for extreme speeding. On February 24, council was scheduled to take the ordinance’s first vote. The March 10 agenda labels the item a “continued first reading,” indicating that the preliminary decision was not completed and is returning for further consideration.

The proposal follows a speed study published January 8 using data collected by Rekor Systems from December 16 through December 22, 2025. The equipment measured northbound and southbound traffic on Highway 82 north of Original Road and south of Two Rivers Road. DacraTech used that seven-day December sample to estimate average daily and monthly totals. Residents should read the monthly violation counts as projections from one week rather than a complete month of directly observed traffic.

North of Original Road, where the limit was 55 miles per hour, the median northbound speed was 54 and the 85th-percentile speed was 60. The 85th percentile means 85% of vehicles were traveling at or below that speed. The projection classified 8,734 monthly northbound events, or 2.5%, as potentially citable. Southbound traffic there had a median speed of 56 and an 85th-percentile speed of 62, with 25,200 projected monthly events, or 6.9%, placed in the citable category.

The sharpest result was southbound south of Two Rivers Road, where the limit drops to 45 miles per hour. The measured median was 53 and the 85th-percentile speed was 59. Only 8.3% of vehicles were recorded at or below the posted limit. DacraTech projected 345,467 monthly vehicles and classified 125,691 events, or 36.4%, as citable. Its projected distribution included 191,190 vehicles from 46 to 55 miles per hour, 81,707 from 56 to 60, 28,916 from 61 to 65 and 15,069 at 66 or faster.

By contrast, northbound traffic at the Two Rivers Road site had a median speed of 51 and an 85th-percentile speed of 56 in the 55-mile-per-hour zone. DacraTech projected 352,864 monthly vehicles and 1,346 citable events, or 0.4%. Those differences raise a central policy question: whether enforcement should focus narrowly on the southbound speed-limit transition near Two Rivers Road or be authorized more broadly. The ordinance title does not select a camera site, and the supplied agenda still does not say where the first equipment would be installed.

The earlier vendor presentation described systems mounted 10 to 14 feet high, powered by electricity or solar energy and able to capture images at night. The process described involved recording a suspected violation, reviewing the evidence, mailing a notice and allowing the recipient to pay, contest the allegation or request a hearing. Colorado implementation steps can include state permitting, selecting an enforcement partner, adopting a local ordinance, holding public hearings, installing equipment and posting warning signs. Additional sites could require permit amendments and new site hearings.

The Dacra Tech agreement is important because it may answer questions the ordinance alone does not: whether the town buys or leases equipment, who reviews images, how long records are kept, what happens when a plate is obscured, who handles challenges, how the vendor is paid and whether compensation depends on citation volume. None of those terms is stated in the supplied excerpt. It also does not provide the proposed fine amount, warning period, expected collection rate, projected town revenue or cost of hearings and administration. Council could advance both measures, amend either one, postpone action or seek more complete financial and privacy terms before committing.

Residents may speak for up to three minutes during the public-comment period near the start of the meeting and may comment again when the ordinance and vendor agreement are called. Comments can also be emailed to council for the record. Useful questions include where cameras would go, what speed would trigger a citation, how long data would be retained, whether a warning period would precede fines, how vendor compensation works and whether March 24 leaves enough time to review the final operating agreement.

Email council about this item
STREET ACCESS & SAFETYNew

Toy Cellar emergency-access agreement comes to council

Council will consider an agreement with Toy Cellar Corporation concerning emergency-vehicle access. The agenda does not identify the affected route, property address or construction involved.

What it means for you

If I live or travel near the affected property, the agreement could protect an emergency route, but the packet excerpt does not identify the location.

The full picture

Council is being asked to adopt Resolution No. 12, Series of 2026, approving a memorandum of understanding with Toy Cellar Corporation regarding emergency-vehicle access. A memorandum of understanding is a written agreement describing the parties’ responsibilities and expectations. Unlike an ordinance, the resolution can be approved in one meeting. Staff has supplied a recommended motion to adopt it, but the agenda excerpt does not include the agreement’s text or identify any requested amendments or conditions.

Emergency access generally concerns whether fire engines, ambulances and law-enforcement vehicles can reach a building or move through a property when ordinary streets, driveways or entrances are unavailable or inadequate. It can involve an access lane, easement, gate, turning area, connection between parcels or restrictions against parking and other obstructions. Those are general examples only: the supplied pages do not say which arrangement is proposed here, and they do not provide a map, legal description, property address, road name or neighborhood.

The agenda names Toy Cellar Corporation as the other party and lists Carlton Henry as the presenter. It does not explain the corporation’s relationship to the affected land, whether it owns the property, whether the town owns any part of the route or whether another public-safety agency will use or maintain it. No history is provided showing when the access issue arose, whether it is tied to development review, whether council approved an earlier plan or whether fire officials requested changes. Residents therefore cannot tell from the excerpt whether this formalizes an existing route or creates a new one.

The missing physical details matter for nearby property owners and travelers. An emergency route can affect where vehicles may park, whether a gate must remain accessible, how snow is cleared, who may use a private drive and whether barriers, signs or pavement are installed. It also can improve response times and give emergency crews a second approach. The packet excerpt does not state whether public traffic would be allowed, whether pedestrian or bicycle movement would change, or whether the agreement would create an easement that remains attached to the property after ownership changes.

No dollar amount, budget line or funding source is listed. The agenda does not say who would pay for design, paving, striping, gates, signs, snow removal, repairs or long-term maintenance. It also gives no effective date, construction deadline, inspection schedule or expiration date. Those terms may be contained in the underlying memorandum, but they are not visible in the supplied text. Council members could ask that the route, responsibilities and any public costs be stated before approval.

The central trade-off is between dependable emergency access and the effects of placing that access on or near private property. A clear agreement can prevent future disputes and give first responders confidence that a route will be open. At the same time, residents may reasonably want to know whether the route affects parking, noise, privacy, landscaping or ordinary vehicle circulation. Council could approve Resolution No. 12 as presented, revise the agreement if both parties agree, postpone the vote for more information or decline approval.

Important open questions include the exact location; which emergency agencies reviewed it; whether the route meets turning-radius, width and load requirements; whether a gate or lock system is proposed; who removes snow; who enforces no-parking restrictions; whether the public gains any access rights; and whether the agreement can be terminated. The agenda also does not identify any dissent from staff, Toy Cellar Corporation, adjacent owners or emergency responders.

Residents may use the general public-comment period near the start of the meeting for up to three minutes and may speak again when Resolution No. 12 is called, following the mayor’s procedures. Because the agenda does not name the affected street or neighborhood, anyone concerned should ask the town for the memorandum and location map before the meeting. Written comments can be emailed to council for the public record, including requests that the final agreement clearly assign construction, maintenance, snow-removal and liability responsibilities.

Email council about this item
WILLITS & TOWN FUNDSNew

Council considers arts-space lease and renovation draw

Council will take an initial vote on leasing Unit R700 in Willits to The Arts Campus at Willits and consider drawing from its endowment for tenant improvements.

What it means for you

If I use Willits, this could shape a local arts space and commit endowment money to improvements, though the supplied terms are limited.

The full picture

Council will consider two linked actions involving The Arts Campus at Willits. Ordinance No. 06, Series of 2026, would approve a lease for Unit R700 in the Block 7 Condominiums. Because this is first reading, approval would be preliminary and would schedule a public hearing and second reading for March 24. A second reading is the ordinarily final council vote on an ordinance. Council will also consider Resolution No. 13, authorizing a draw from The Arts Campus at Willits endowment fund for tenant improvements.

The Arts Campus at Willits is identified in the agenda by the initials TACAW, but the packet excerpt provides little background on Unit R700 or why a new lease is needed. It does not say whether the unit is already occupied by the organization, whether this replaces an expiring agreement, whether the town recently acquired the unit or whether it will support performances, administration, storage, education or another use. The amended-packet notice says the lease agreement was added to Item 7D, confirming that the lease itself is new material in the packet, but its provisions are not included in the supplied text.

The property is described only as Unit R700, Block 7 Condominiums. No street address, floor area, floor plan, parking allocation or description of neighboring uses appears in the excerpt. The location is in Willits, so the most direct effects may be felt by nearby businesses, residents, visitors and people attending arts programs. Depending on the intended use, practical questions could include operating hours, deliveries, sound, event traffic, accessibility and shared-building rules. The agenda does not provide enough information to say which of those issues applies.

The lease ordinance is also silent in the supplied text on rent, lease length, renewal options, security deposit, utilities, insurance, repairs, property taxes, condominium assessments and responsibility for complying with building or fire codes. It does not say whether rent is at market value, reduced as public support or offset by services to the community. Nor does it identify an early-termination clause, limits on subleasing or what happens to installed improvements when the lease ends. Those are core terms residents may want available before the March 24 final vote.

Resolution No. 13 would authorize money from The Arts Campus at Willits endowment for tenant improvements, meaning work needed to prepare or adapt the leased space for use. The agenda does not identify the requested draw, current endowment balance, specific improvements, contractor, procurement method or project budget. It also does not say whether the money is principal, investment earnings or another restricted portion of the fund. Without those figures, residents cannot assess what share of the endowment would be used or how much would remain afterward.

The timeline is only partly clear. If council approves the lease on first reading March 10, the proposed public hearing and final vote would be March 24. Resolution No. 13, however, can be adopted immediately on March 10. The agenda does not explain whether the endowment draw would occur before final lease approval, whether work would wait until the lease is effective, or when construction and occupancy are expected. It also does not identify permits, condominium approval or inspections that may be required after the votes.

Council’s trade-offs include supporting arts programming and activating space in Willits while protecting a town-connected asset and preserving the endowment for future needs. Tenant improvements may make the unit more useful and could remain with the property, but specialized work may have limited value if the lease is short. A below-market lease could deliver a public cultural benefit, but council would need enough information to compare that benefit with rent and other costs the town may forgo. The supplied agenda records no disagreement, competing tenant or alternative use for Unit R700.

Council could approve first reading and review the full lease before March 24, amend the proposed terms, postpone the ordinance, or decline it. For the endowment resolution, council could approve the draw, reduce or condition it, require a detailed improvement budget, or wait until the lease is final. Reasonable questions include the rent and term, the precise public use, the improvement amount, the remaining endowment balance, ownership of improvements, responsibility for overruns and whether spending is contingent on final lease approval.

Residents may comment for up to three minutes during the public-comment period near the start of the meeting and again when the lease ordinance and endowment resolution are called, following the mayor’s procedures. Written comments may be emailed to council for the public record. Because the packet was amended to add the lease, residents interested in Willits or town support for the arts may want to request that document and the tenant-improvement budget before commenting.

Email council about this item

Get the next brief in your inbox

Agendas post the Friday before each Tuesday meeting. We read them over the weekend so you have days to write in or show up.

What should we send you?