Council reaches its first vote on the Movieland hotel
Council will consider preliminary approval for a 93-room Residence Inn by Marriott and three deed-restricted apartments at 218 East Valley Road. The Planning and Zoning Commission recommended denial.
What changed since last time
Council previously visited the site and had continued the hotel hearing without taking a vote. The applicant has since moved the building 10 feet toward East Valley Road, increased its separation from Sopris Village, preserved more trees, added screening and supplied ten-year revenue estimates. Council is now being asked for first-reading approval, with a final hearing proposed for November 10.
What it means for you
For residents, this could replace the Movieland site near Sopris Village with a three-story hotel, new lodging-tax revenue, employee housing and more activity.
The full picture
Council is being asked to approve Ordinance No. 23 on first reading, the preliminary vote required before final adoption. The ordinance would authorize a 93-room Residence Inn by Marriott, three deed-restricted apartments, a site plan, a parking reduction and amendments to the property’s planned unit development. A planned unit development is a site-specific zoning agreement governing uses and building dimensions. If council advances the ordinance, the public hearing and final vote would continue to November 10. Council could instead deny it or postpone the first vote to November 10 while requesting more information.
Walsh Dupart, representing Bowtie Partners and WDB Basalt Hotel I JV LLC, applied to redevelop 218 East Valley Road, the former Movieland site in Old Orchard Plaza. The Planning and Zoning Commission reviewed the application June 16, July 7 and August 4 and ultimately recommended denial, although its members were divided over whether a hotel was compatible with the surrounding area. The Basalt Affordable Community Housing Commission supported the housing portion. Council opened its hearing September 8, heard public comments and continued it. Council also visited the property September 22.
The latest plan contains a three-story, 67,226-square-foot hotel on a 91,710-square-foot lot. The applicant proposes 93 guest rooms and three ground-floor workforce studios measuring 553, 643 and 457 square feet. All three apartments would be deed-restricted at the town’s Category 2 level, with first priority for employees working on the property. If no qualifying hotel employee occupies a unit, priorities would move through essential and nonessential employees working in Basalt and then employees elsewhere in the Roaring Fork Valley. Each apartment would have 50 square feet of storage, and the project includes dedicated bicycle storage.
The applicant estimates the hotel would create 16 jobs, equal to 13 employees and demand for nine homes under its calculation. Basalt’s 15% commercial-housing mitigation requirement would produce an obligation of 1.35 units, so the applicant says three apartments exceed the requirement. Town housing staff accepted that alternative calculation because lodging differs from the retail use assumed by the standard formula. The housing commission also found that the units meet town requirements for size, kitchens, bathrooms, amenities and livability. The applicant wants shared outdoor space instead of a separate deck for each apartment, an arrangement previously allowed in Willits mixed-use projects.
The plan provides 93 parking spaces. Town standards call for 97.5 spaces—93 for lodging and 4.5 for the apartments—and the property also has an obligation to provide 12 nonexclusive spaces for an adjacent parcel unless that arrangement is renegotiated. Staff describes the request as a 16.9% reduction when those 12 spaces are included, or effectively a 4.7% reduction in the project’s own minimum. The applicant proposes dashboard passes, nighttime monitoring and towing warnings to prevent guests from parking on nearby streets or private lots. Plans also show 11 active electric-vehicle charging spaces and six spaces prepared for future chargers.
Sopris Village has been central to the revisions. Since September 8, the applicant moved the building 10 feet toward East Valley Road and Highway 82 and 10 feet farther from the western property line. The building would now be 66 feet, 7.5 inches from the nearest residential fence. The revised landscape plan preserves more existing pines, adds three evergreens on the west side and creates a denser planted barrier along Sopris Village Drive. Landscaped open space would cover 25,717 square feet, or 28.3% of the property, above the 20% minimum. The applicant also offered to discuss fencing around the Sopris Village park.
A proposed good-neighbor plan requires quiet hours from 10 p.m. to 7 a.m., on-site pet-relief areas, signs directing guests toward Crown Mountain Park rather than the private Sopris Village park, and monthly cleanup of the path between the hotel, the Roaring Fork Transportation Authority station and the Willits Lane roundabout. The applicant would reconstruct the shared sidewalk along the Sopris Village boundary and use screened, bear-resistant trash and recycling enclosures. Eagle County has agreed to install a “No Thru Traffic” sign at the entrance to Sopris Village Drive. The project would not build over the subdivision’s water line, and the applicant must create a well-monitoring agreement similar to the one used for the El Jebel Park and Ride.
Fire and street conditions would continue into building-permit review. Roaring Fork Fire Rescue called the proposed Type V-B construction—the lowest fire-rated construction type—a concern and requires automatic wet standpipes in both stairwells, sprinklers, monitored alarms, emergency radio coverage if needed, added emergency-access equipment and a minimum fire flow of 1,875 gallons per minute at 20 pounds per square inch of residual pressure. Town engineering also wants safer turning movements at East Valley Road, accessible sidewalks and ramps, a drainage report, adequate snow storage and coordination with nearby transportation improvements. The ordinance requires the applicant to satisfy those comments before receiving a building permit.
The site’s existing agreement was written for a 15,000-square-foot movie theater, so the hotel requires changes to allowed use, floor area, height and signage. The ordinance lists a maximum floor area of 67,226 square feet and a building height of 34 feet, 11 inches. Other packet sections cite a 34-foot, 5-inch main roof and a 35-foot, 11-inch height including some roof features, an apparent inconsistency council may want clarified. The property’s future land-use map still identifies its existing service-commercial use; a separate master-plan amendment removing that designation must be approved before or with final development approval.
The applicant estimates the project would generate $8,596,737 for Basalt over ten years and $4,580,559 for local schools, fire protection, the library, parks, transit, water and sanitation, early childhood programs and Colorado Mountain College. The finance director reviewed the assumptions and considered them reasonable, but the packet does not provide a town guarantee or operating history. After final approval, agreements, deed restrictions, a 1% real-estate transfer assessment and the well-monitoring plan would have to be completed within 180 days. A building permit must be obtained within three years. Residents may use the three-minute public-comment period near the start of the meeting, speak again when the hotel hearing is called, or email council and ask that their comments be included in the record.