Meeting of May 26, 2026

Final votes, development rules and another 555 delay

Council faces final votes on wildfire, housing and Riverwalk proposals, while opening discussion of new affordable-housing and Midland Avenue development rules.

Safety & propertyBack again

Wildfire construction rules return for a delayed final vote

Council will again consider final adoption of Colorado’s 2025 wildfire-resiliency code. It would govern new construction and certain larger projects in mapped wildfire-risk areas.

What changed since last time

The ordinance was listed for a final vote on May 12, but it appears again for second reading and final action on May 26. The supplied agenda does not explain why the earlier final vote did not resolve the ordinance or identify further revisions since May 12.

What it means for you

If I build or substantially alter property in a mapped risk area, Basalt’s new wildfire standards could affect materials, design, landscaping and cost.

The full picture

Council is being asked to adopt Ordinance No. 07, Series of 2026, on second reading. A second reading is the final council vote on an ordinance after preliminary approval. The ordinance would amend Section 18-103 of the town code and adopt the 2025 Colorado Wildfire Resiliency Code by reference. That means the state code would become part of Basalt’s enforceable rules without being copied word-for-word into the municipal code. The May 26 agenda includes a public hearing, and staff recommends adoption.

The ordinance was introduced April 28, when Town Attorney Jeff Conklin and Chief Building Official Mitch Miller explained that the Colorado Legislature created a state wildfire-resiliency board and required affected local governments to adopt standards at least as protective as the state model. Basalt lies within the wildland-urban interface, the area where homes and other development meet or mix with vegetation capable of carrying wildfire. Council approved first reading 5-0 and added a route for property owners to appeal certain building-official decisions to the Town Council.

The code addresses both structures and the area immediately around them. Its requirements depend on a property’s mapped wildfire-intensity designation. New buildings would be covered, and the earlier packet said a specified amount of replacement, remodeling or an addition could also trigger compliance. The supplied May 26 pages do not include the code’s exact thresholds, map or construction tables, so they do not establish which roof, siding, vent, window, deck, fence or landscaping product would be required at any particular address.

The building official would have authority to consider alternative materials or site-specific modifications when those choices would not increase wildfire danger or reduce safety. Council’s April 28 amendment would let an owner appeal a decision about a requested modification. Broader departures from the state code would need to follow Colorado’s variance process. Staff previously said it would return with another local amendment if the state approves the larger changes Basalt requested, but this packet does not report the status of that request.

Property owners, builders, architects and contractors working in Basalt’s mapped risk areas would feel the direct effect. The available pages do not say whether Old Town, Willits, Southside, Midland Avenue or another named neighborhood is entirely or partly within those mapped areas. Townwide, the intended benefit is to make buildings more resistant to embers, flames and radiant heat and to reduce the chance that fire spreads from one structure to another.

No town expenditure or estimated private construction cost is attached to the ordinance. The packet does not calculate the added price for a typical home, commercial building, remodel or addition, and it identifies no rebate or grant program. It also does not say whether the town will need more inspectors, permit revenue or staff training. Earlier material identified July 1, 2026, as the deadline for Basalt to begin enforcing a qualifying code, leaving a short implementation period if the ordinance passes May 26.

Council’s central trade-off is stronger wildfire protection versus the cost and design constraints placed on qualifying construction. Residents may reasonably ask for the final map, project thresholds, appeal process, effective date and examples showing how common improvements would be treated. They may speak for up to three minutes during public comment near the start of the 6 p.m. meeting and again when the public hearing is called. Written comments may also be emailed to council for inclusion in the public record.

Email council about this item
Southside developmentBack again

The 555 Basalt Avenue hearing is postponed to June 9

Council is scheduled to delay the 555 Basalt Avenue hearing again, without deciding the proposed 47 homes and 54 commercial storage or flexible-work units.

What changed since last time

On May 12, council was scheduled to move the hearing to May 26. The new consent item would postpone it again, this time to June 9. The agenda identifies no revised unit count, housing offer, circulation plan or reason for the additional delay.

What it means for you

If I travel or live near Fiou, Cody or Summerset lanes, the project’s housing, traffic and emergency-access questions remain unresolved until at least June 9.

The full picture

Council is not being asked to approve or deny the 555 Basalt Avenue redevelopment on May 26. Consent-agenda item 2C would continue the public hearing to June 9, 2026. A continuance moves an open hearing to a later meeting without deciding the application. Because the item is on the consent agenda, it may be approved together with other business unless a council member asks to remove it for separate discussion. The agenda gives no reason for this latest delay.

The application concerns the Myers & Company property in Southside, near Fiou Lane and Cody Lane. MREH LLC proposes demolishing the existing improvements and constructing 47 residential units and 54 commercial storage or flexible-work units. The roughly 4.8-acre site is zoned Industrial and is part of the Basalt Business Center South planned unit development. A planned unit development is a customized zoning plan establishing rules for a particular property or group of properties.

The proposal requires special review, site-plan approval, amendments to the planned unit development and actions related to the Southside floodplain. Staff previously found that it would also require changes to Basalt’s master-plan future-land-use map and typology descriptions. The master plan currently identifies the property as an existing industrial use rather than an expected redevelopment site, and its mixed-use guidance anticipates residential and commercial uses being integrated rather than separated into different parts of a property.

At the April 28 hearing, the applicant offered to restrict 22 of the 47 homes, or 47% of the total. Eleven would be for-sale, price-capped homes averaging Category 3 under Basalt’s housing system. Another 11 would carry primary-residency restrictions but would not have the same price and income limits. Council members questioned whether that package provided enough public benefit to justify a project-specific master-plan change, particularly for property near regional transit. The May 26 agenda does not identify a revised housing offer.

Traffic and emergency access also remain unsettled. The applicant previously proposed treating 24 commercial units totaling 24,000 square feet as light industrial space and legally limiting 30 units to storage. Its consultant estimated 27 morning peak-hour trips and 39 afternoon peak-hour trips, compared with counts of 31 morning and 40 afternoon trips from the existing Myers operation. Residential traffic would use Cody Lane, while commercial traffic would use Fiou Lane. Those estimates rely on the long-term enforceability of the use restrictions.

Six circulation alternatives were discussed April 28. The applicant, a preschool operator and much of the discussion favored an option making Summerset Lane one-way northbound and Fiou Lane one-way southbound, with pedestrian circulation and firefighting access. The fire department reportedly rejected the two least extensive alternatives. A representative of the Basalt Business Center East homeowners association raised concerns about directing more vehicles to Cody Lane, described as narrow, without sidewalks and bordered by ditches. Council also heard that the town currently lacks money for Fiou Lane improvements.

The packet identifies no new project cost, public financing plan, construction date or revised conditions. The next scheduled step is the June 9 hearing, assuming council approves the continuance. Residents may use the three-minute public comment period near the start of the May 26 meeting to address the delay or ask that the consent item be discussed separately. When the continued hearing is eventually called, public comment should be available again. Residents may also email council so their comments on housing, traffic, floodplain issues or emergency access become part of the record.

Email council about this item
Downtown designNew

New Midland Avenue design rules begin their council review

Council will consider design guidelines and zoning changes for the Midland Avenue district, including the downtown business and service-commercial zones. Final action would follow June 9.

What it means for you

If I own, improve or redevelop property around Midland Avenue, the new standards could shape future building design and the review process.

The full picture

Council is being asked to approve Ordinance No. 11, Series of 2026, on first reading and schedule a public hearing and second reading for June 9. First reading is the preliminary vote that moves an ordinance forward; it does not make the rules final. The ordinance would adopt the Midland Avenue District Design Guidelines and amend Chapter 16 of the municipal code, including Section 16-29 for the C-2 Downtown Business District and Section 16-30 for the CSC zone district. The agenda does not expand “CSC,” so its full formal name cannot be confirmed from the supplied pages.

The planning department reports that council held a work session on the design guidelines April 14. The Planning and Zoning Commission then held a public hearing and made a recommendation May 19. The packet does not reproduce that recommendation, vote or meeting discussion. It also does not include the proposed guideline document, marked-up zoning language or staff report within the pages supplied here, so the exact design standards council will debate are not available in this excerpt.

The agenda was amended to add a letter from Laura Maine concerning the design guidelines and historic designation. The letter itself is listed under correspondence but is not included in the supplied text. Residents therefore cannot tell from these pages whether it supports the ordinance, requests changes or raises concerns about particular properties. The reference to historic designation suggests that the relationship between new design rules and historic resources may be part of the conversation, but the packet excerpt does not identify any building proposed for designation.

Design guidelines commonly address how new construction and exterior changes relate to a district, but this agenda does not spell out the subjects covered here. It does not say whether the proposal regulates building height, mass, setbacks, storefronts, windows, roofs, signs, lighting, colors, materials, river access, parking, demolition or additions. It also does not identify which requirements would be mandatory, which would be advisory, or whether existing buildings could continue unchanged until an owner proposes new work.

The immediate area is Midland Avenue and the downtown zoning districts named in the ordinance. Depending on the district boundaries, the rules could affect Old Town property owners, businesses, tenants, architects and developers seeking approval for future improvements. For Basalt as a whole, the guidelines could influence downtown character, preservation, redevelopment cost and the ease of adapting older properties to new uses. The packet does not include a boundary map, so residents should not assume that every Midland Avenue property is covered identically.

No direct town appropriation or estimated private compliance cost is stated. The packet does not analyze whether particular materials or review requirements would make projects more expensive, nor does it identify grants or incentives for historic preservation or façade work. If first reading passes, staff would prepare the ordinance for the June 9 public hearing and final vote. The planning report lists June 9 as the expected completion date for adoption, although council could amend, continue or reject the proposal.

Council must weigh consistent design and preservation of downtown character against property-owner flexibility, project cost and the possibility of making redevelopment harder. Useful questions include whether standards apply to routine maintenance, how conflicts with building or accessibility codes would be handled, and whether historic designation is voluntary or tied to this ordinance. Residents may speak for three minutes during general public comment near the start of the May 26 meeting and again when Ordinance No. 11 is called. Comments may also be emailed to council for the record before the June 9 final hearing.

Email council about this item
Affordable housingNew

Basalt proposes a faster review track for affordable housing

A proposed zoning amendment would create an expedited review process for qualifying affordable-housing projects, helping Basalt comply with Colorado Proposition 123 requirements.

What it means for you

If I support or propose affordable housing anywhere in Basalt, qualifying projects could move through town review faster, though the packet omits the exact timetable.

The full picture

Council is being asked to approve Ordinance No. 10, Series of 2026, on first reading and set a public hearing and second reading for June 9. The ordinance would amend Chapter 16 of the town code to establish an expedited review process for affordable-housing projects in response to Colorado Proposition 123. First reading is an initial vote that advances the proposal; the zoning changes would not become final unless council later adopts them after the second public hearing.

Colorado voters approved Proposition 123 as a statewide affordable-housing measure. The May 26 packet, however, does not reproduce the state requirements or explain which funding, eligibility or compliance benefit Basalt seeks to preserve. The planning department reports that the Planning and Zoning Commission recommended approval. It also lists June 30 as the target for adopting the Proposition 123 code amendments, giving council a limited period after the proposed June 9 final vote to complete any follow-up work.

The key concept is an expedited review process: qualifying applications would be handled on a faster schedule than ordinary development proposals. The supplied pages do not state the required number of days, define when the review clock begins, or explain when it may pause for missing information. They also do not specify which applications qualify, how many homes must be affordable, what income levels or deed restrictions would apply, or whether mixed-income projects receive the faster treatment.

The packet also does not show which review stages would change. It is unclear whether the ordinance would shorten staff review, reduce the number of hearings, create special meeting deadlines, prioritize affordable projects ahead of other applications or limit extensions. Nothing in the supplied text says that safety, building, floodplain, water, traffic or public-notice requirements would be waived. Residents should distinguish a faster decision schedule from automatic approval: an expedited process can still result in approval with conditions or denial.

The amendment could apply townwide to qualifying affordable-housing proposals rather than to one named parcel. That makes it relevant to future projects in Old Town, Willits, Southside, Midland Avenue and other parts of Basalt, although the agenda does not identify any neighborhood-specific application being approved through this ordinance. The practical effect could be less uncertainty and carrying cost for housing developers, while town staff and reviewing agencies may face tighter deadlines.

No budget, staffing estimate or fee change accompanies the ordinance in the supplied packet. It does not say whether Basalt will hire reviewers, use consultants, adjust application fees or redirect staff from other projects. Faster review can lower financing costs by reducing delay, but the agenda provides no estimate of those savings. If first reading passes May 26, council will hold the final hearing June 9, with the planning department aiming to have the amendment adopted by June 30.

The trade-off is speed versus the time available for technical review and public participation. Council may want clarity on the qualifying affordability standard, the review deadline, incomplete applications, complex infrastructure issues and how neighbors will receive notice. It may also ask what happens if the town misses a deadline and whether the change affects Basalt’s access to state housing resources. Residents may comment for three minutes near the start of the meeting and again when Ordinance No. 10 is called. They may also email council so their comments are included in the record before final action.

Email council about this item
Deed-restricted housingBack again

One deed-restricted home at 540 Basalt Avenue reaches a final vote

Council will take its final vote on a 659-square-foot, two-bedroom Category 5 home within an existing Southside mixed-use building. The footprint would not expand.

What changed since last time

Council previously considered this application on first reading; May 26 is the second reading and final vote. The stated proposal remains one 659-square-foot, two-bedroom Category 5 home, and the current agenda identifies the address consistently as 540 Basalt Avenue.

What it means for you

If I live or work near Basalt Avenue and Fiou Lane, this adds one restricted home without enlarging the building, though parking details remain unclear.

The full picture

Council is being asked to adopt Ordinance No. 08, Series of 2026, on second reading. Second reading is the final council vote after preliminary approval and another public hearing. The ordinance grants site-plan review, special review, a planned unit development amendment and approval of a housing mitigation report for one deed-restricted dwelling at 540 Basalt Avenue. The suggested motion is to adopt the ordinance as presented.

PC Development, LLC applied to add the home to an existing mixed-use property at the northwest corner of Basalt Avenue and Fiou Lane in Southside. The 7,838-square-foot property is in the Industrial zone and within the Basalt Business Center South planned unit development. A planned unit development is a customized set of zoning rules for a particular property or group of properties. Commercial, residential and industrial uses are found nearby.

The existing building contains The Rug Wash on the ground floor and a 758-square-foot, two-bedroom residence on the second floor. The proposal would add a second two-bedroom dwelling measuring 659 square feet. It would be deed-restricted at Category 5 under Basalt’s community-housing system. A deed restriction is recorded against the property and controls eligible occupancy and other housing terms over time. The packet excerpt does not give the expected sale price, rent or household-income limit.

The application would not expand the building envelope or footprint. The Southside floodplain crosses the property, but no outward enlargement is proposed. The available material does not clearly identify which interior space would become the new dwelling, what exterior alterations are necessary or whether any square footage now used by the business would be converted. It also does not give a floor plan, bedroom dimensions, assigned parking space, expected occupancy or details about storage and outdoor space.

Both the Basalt Affordable Community Housing Commission and Planning and Zoning Commission previously recommended approval with conditions included in the draft ordinance. The Planning and Zoning Commission considered the project March 17. Those conditions are not reproduced in the supplied May 26 text, leaving questions about parking, floodplain compliance, utility capacity, permits, occupancy monitoring and continued operation of the ground-floor business. Council can clarify whether the conditions changed after first reading.

The immediate impact is concentrated at Basalt Avenue and Fiou Lane in Southside. One additional household may add a modest amount of parking demand and daily activity, but there would be no new building footprint. Townwide, the project would produce one deed-restricted home by using an existing mixed-use site. Staff previously connected it to master-plan goals supporting workforce housing, varied housing types, walkability and homes near commercial and transit services.

No construction budget, public subsidy, town expenditure or completion date is provided. The ordinance also does not say whether the unit fulfills an existing housing obligation or represents housing beyond a required amount. Council must weigh the benefit of one additional restricted home against unanswered questions about parking, unit configuration and enforceable conditions. Residents may speak for three minutes during general public comment near the start of the meeting and again during this item’s public hearing. Written comments may also be emailed to council for the public record.

Email council about this item
Midland Avenue accessBack again

Riverwalk vehicle gate returns for final approval

Council will take its final vote on a vehicle gate at the Riverwalk at Fryingpan development, 227 Midland Avenue. Operating and access details remain absent from the supplied pages.

What changed since last time

The May 12 item was first reading, which advanced the planned unit development amendment without making it final. May 26 brings the public hearing and second reading. The agenda does not identify a changed gate location, operating plan or approval condition.

What it means for you

If I travel near 227 Midland Avenue, the gate could change vehicle access or turning movements, but its location and users are not explained.

The full picture

Council is being asked to adopt Ordinance No. 09, Series of 2026, on second reading. A second reading is the final vote on an ordinance after council’s preliminary approval. The ordinance would amend the planned unit development for the Riverwalk at Fryingpan development at 227 Midland Avenue to permit installation of a vehicle gate. A planned unit development is the customized zoning plan governing a specific development.

The proposal first came before council for ordinance action on May 12. The May 26 agenda identifies Interim Planning Director James Lindt as the presenter and schedules a public hearing before the final vote. The supplied pages do not include the applicant’s narrative, staff report, site plan, draft approval conditions or record of council’s first-reading discussion. They therefore do not show whether council requested changes before bringing the gate back for final action.

Only the basic physical proposal—a vehicle gate—is confirmed. The packet does not identify where the gate would be placed, which driveway or internal lane it would control, or whether the gate already exists and needs formal approval. It does not say whether there would be a keypad, card reader, remote control, intercom, signs, fencing or turnaround. It also does not give the gate’s height, appearance, opening direction or distance from Midland Avenue.

The ordinance title calls it a vehicle gate, but the supplied material does not explain what happens to pedestrian, bicycle or mobility-device access. It would be inaccurate to assume that the gate blocks a public street, public trail or public riverwalk. The pages also do not identify who could enter: residents, employees, customers, delivery drivers, maintenance crews or other users. Hours of operation and procedures for guests are not stated.

Emergency access is another unresolved detail in the excerpt. There is no description of fire-department approval, emergency override equipment, backup power or operation during an outage. The packet does not address snow storage, maintenance, a malfunctioning gate or whether a waiting vehicle could block a sidewalk or back into Midland Avenue. Those points may appear in documents outside the supplied pages, but they cannot be assumed here.

The site at 227 Midland Avenue is within the Midland Avenue and Old Town area. A gate could improve security and control unwanted vehicle entry to a private development. Depending on its placement, it could also cause vehicles to stop, queue, turn around or seek another route. No traffic count, circulation study, project cost, town contribution, construction date or maintenance assignment is provided. The agenda does not say whether the applicant would bear every installation and operating expense.

Council must balance private access control against safe and understandable circulation near Midland Avenue. Before voting, it could clarify emergency access, pedestrian passage, delivery procedures, vehicle stacking and who is responsible if the gate fails. It could adopt the ordinance, add lawful conditions, continue the hearing or reject the amendment. Residents may speak for three minutes during public comment near the beginning of the meeting and again when the Riverwalk hearing is called. They may also email council to place comments in the record.

Email council about this item

Get the next brief in your inbox

Agendas post the Friday before each Tuesday meeting. We read them over the weekend so you have days to write in or show up.

What should we send you?